I-805 and Olympic Parkway
Interchange,
I-805 and Telegraph Canyon Road and
I-805 and Palomar Street
Chula Vista, CA
Rick Engineering Company's
Transportation Division prepared project development documents
for three interchanges on Interstate 805. The project included
traffic forecasting, traffic impact analysis, and alternative
studies to upgrade the capacity of current and future city growth.
The scope of work included preliminary design and environmental
clearance for upgrading of the existing interchanges at Telegraph
Canyon Road and Orange Avenue - Project Study Report/Project
Report/Environmental Documents (PSR/PR/ED). The project also
included a preliminary design alternative to support an Access
Approval Request to the FHWA for a new interchange at Palomar
Street, followed by a PSR. Additional scope of work included
plans, specifications and estimates (PS&E) for the Telegraph
Canyon Road and Olympic Parkway interchange improvements. Work
consisted of the realignment of exit ramps, ramp widenings, signalization
of ramp termini, traffic signing, striping, stage construction,
and tie-backing retaining walls.
PREVIOUS NEXT