El Camino Real Road and
Bridge Widening
San Diego, CA
Rick Engineering
Company's Transportation Division was responsible for the widening
and realignment of
the existing El Camino Real roadway and bridge. The project included
the preparation of Environmental Impact Report (EIR) and Environmental
Assessment (EA) documents in conjunction with the City of San
Diego, Caltrans, and environmental consultant staff. Other tasks
included preliminary engineering design, preliminary hydrology
and hydraulic studies, preliminary bridge studies and analysis,
hydrology and hydraulic studies of the San Dieguito River, preparation
of environmental exhibits for inclusion into the EIR & EA
documents, utility impact studies, right-of-way documentation,
and preliminary construction estimates for this project. A portion
of the project was funded by the City of San Diego.