Rick Engineering Company’s Water Resources Division has analyzed thousands of miles of culverts, storm drains, and river channels throughout California and Arizona. Many to support the design of channel or culvert improvements and to improve flooding concerns or benefit the community, others to assess the impact of a proposed project on the floodplain within the river.

  • Market Creek Plaza
  • Presidio View Box Culvert
  • Beeler Creek Hydraulic Analysis
  • Telegraph Canyon Channel
  • "The Lakes" at Menifee
  • Brewer Road Bridges
Transportation projects may require drainage calculations that involve coordination with the Department of Transportation and require additional modeling and reporting, including floodplain evaluation studies, floodplain encroachment studies, and location hydraulic studies.
  • South Santa Fe Avenue Floodplain Alternatives Analyses
  • Ivy Street & Guava Street Bridges
  • NCTD SPRINTER Rail Project
Many of the projects involving hydraulic studies have ultimately needed to be processed with FEMA to be compliant with the National Flood Insurance Program. Rick Engineering Company’s Water Resources Division has the resources and expertise to provide those services as well.